Rough-in

nounStandard termElectricians

Stage of electrical work done before walls close: setting boxes, running cable or conduit and pulling wire.

Rough-in is the first major phase of wiring a building, done with the framing open: mounting boxes at the right heights, drilling and running cable or conduit, pulling wire and making up grounds and splices in the boxes. It ends with a rough inspection that must pass before insulation and drywall go up. Getting rough-in right, especially box heights and box depth relative to the finished wall, decides how smoothly trim-out goes.

Heard on the job

Rough-in inspection is Thursday, every box needs its grounds made up and the cables stapled close to the boxes.

Also heard as

  • rough
  • rough wiring