A heavy transverse timber or steel beam laid perpendicular to the track alignment to support the longitudinal stringers. This arrangement is typically found on older timber trestle bridges or specialized open-deck structures where standard cross-ties cannot be laid directly on the subgrade.
Heard on the job
The bridge inspector noted severe rot on the third cross-sill past the abutment.