These saws go on the slab as soon as it can carry a walker, often 1 to 4 hours after finishing, and cut a shallow groove about 1 to 1.25 in deep with a skid plate that keeps the edges from raveling. The early timing beats the random cracking that conventional wet saws, run 4 to 12 hours later at full quarter depth, sometimes arrive too late to stop. Crews often call any of them a Soff-Cut after the best-known brand.
Get the early-entry saw on the warehouse slab the minute it holds you, it's supposed to be 95 and windy.