Skin time

nounStandard termWaterproofing

How long after application a sealant forms a surface skin, which ends the window for tooling.

Moisture-curing sealants start curing at the surface first, typically forming a skin in about 10 to 60 minutes depending on chemistry, temperature and humidity. Tooling must be done before the skin forms, or the bead tears, wrinkles and loses contact with the joint faces. Tack-free time, a little later, is when dust no longer sticks. Hot, humid days shorten both.

Heard on the job

Skin time on this silicone is ten minutes in this sun, so gun a short run and tool it right behind.

Insider tip

On hot afternoons crews gun shorter runs so the tool man stays inside the skin time.

Also heard as

  • skinning time
  • tooling time