Final setting time

nounStandard termConcrete

The point at which fresh concrete has completely lost its plasticity and can bear some load.

A standardized measurement marking the moment a cement paste or concrete mixture hardens enough to resist a specific penetration force. At this stage, the chemical hydration has advanced enough that the concrete can no longer be molded or finished, and it begins to develop measurable compressive strength.

Heard on the job

The mix design says the final setting time is four hours, so we can get the early-entry saw on it by noon.