Facade crews break buildings into drops, each one the width they can reach from a suspended stage or chair. Work is scheduled, priced and tracked per drop: rake out, prime, rod, seal and tool from roof to ground, then move the rigging over. Drop counts tell everyone how far along the job is.
We finished drop 7 on the east elevation, move the rig over and start 8 in the morning.
Also heard as
- drops
- stage drop
Related terms
Bosun's chair
A single-person seat suspended from roof rigging, used by caulkers and restoration workers on facades.
R&R
Remove and replace: cutting out old sealant completely and installing new sealant in the cleaned joint.
Rodding
Installing backer rod into joints ahead of the sealant crew.
Tuckpointing
Common trade name for repointing brick, though strictly it is a decorative technique with a contrasting thin joint line.
Same word, different worlds
The final fiber cable run from a distribution terminal on the street to a single customer building.
Engineering StatisticsA sudden or significant decrease in a measured value, process yield, or performance indicator.
Production & ManufacturingA scheduled delivery of parts, materials, or finished goods to a specific location on the floor.