Drop
Drop turns up in 4 fields: fiber optics, waterproofing, statistics, production. Here is what it means to the people in each one.
Drop in fiber optics
The final fiber cable run from a distribution terminal on the street to a single customer building.
A small fiber cable, often one to twelve fibers, run aerially, buried or through conduit from a terminal or pedestal to the customer's premises. Drops are often pre-connectorized with hardened connectors that plug into the terminal without splicing. It is the last and most frequently damaged link in an FTTH network, cut by lawn mowers, landscapers and fence posts.
"Drop's cut where the homeowner put the new fence in, run a temporary across the yard and get a locate for the bore."
Drop in waterproofing
A vertical strip of facade worked from top to bottom on one setup of a swing stage or bosun's chair.
Facade crews break buildings into drops, each one the width they can reach from a suspended stage or chair. Work is scheduled, priced and tracked per drop: rake out, prime, rod, seal and tool from roof to ground, then move the rigging over. Drop counts tell everyone how far along the job is.
"We finished drop 7 on the east elevation, move the rig over and start 8 in the morning."
Drop in statistics
A sudden or significant decrease in a measured value, process yield, or performance indicator.
A measurable decline in a process output, typically referring to a sudden loss of yield, a reduction in defect counts, or a downward shift in a control chart mean. Engineers monitor drops closely because an unexpected decrease in yield signals a new special cause of variation. Conversely, a drop in defect density indicates a successful process improvement.
"We saw a massive yield drop at step four after the maintenance cycle, so pull the logs and check the tool calibration."
Drop in production
A scheduled delivery of parts, materials, or finished goods to a specific location on the floor.
The physical delivery of a batch of components to a workstation on the assembly line, or the scheduled release of a new production run. In logistics and material handling, it refers to the exact point where a forklift or automated guided vehicle deposits a load for the operators to use.
"The material handler missed the 10 AM drop, so the assembly cell is starved for brackets."