An authorization given by a conductor or station staff to the locomotive engineer indicating that all passenger doors are closed, boarding is complete, and it is safe to move. It is typically delivered via a buzzer system, a hand signal, or a radio transmission.
Heard on the job
I got the right-away signal from the conductor, so let's notch it out and get moving.
Also heard as
- highball
- buzzer