Type III cement

nounStandard termConcrete

High-early-strength portland cement, ground finer so concrete gains strength in days instead of weeks.

A portland cement ground finer and usually richer in tricalcium silicate, so it hydrates faster than Type I/II. A Type III mix often reaches in 3 days the strength a standard mix needs 7 days to reach. Precast plants, winter pours, fast-track pavement patches and jobs that must strip forms or stress tendons early rely on it, at the price of more heat and a shorter working time.

Heard on the job

Order the column mix with Type III cement and hot water, we need to strip those forms tomorrow morning.

Insider tip

On a summer pour Type III can kick before the finishers are ready, so it is a winter and precast tool more than a general fix.

Also heard as

  • high-early cement
  • HE cement
  • high-early