This method leaves alternating voids and projecting bricks at the vertical edge of a masonry wall. It allows masons to interlock a new section of wall into the existing one at a later time, creating a continuous structural bond. While common in older construction and additions, building codes often restrict its use in load-bearing walls due to the difficulty of fully packing the mortar joints during the tie-in.
Leave some toothing on the east elevation so the next crew can tie in the extension on Monday.
Always check the structural drawings before leaving a toothed edge, as engineers often prefer stepped racking or mechanical wall ties for better lateral strength.