Joint matching

nounShop talkAsphalt

Setting the screed so the new mat overlaps the old edge slightly and sits just high enough to roll down flush.

Crew practice at a longitudinal joint: the screed end gate runs about 1 to 1.5 inches over the edge of the previous pass, and the new mat is set higher than the old by the expected roll-down. Done right, the roller compresses the hot side level with the cold side and pinches the joint tight. Overlap too much and the rakers must bump the excess; overlap too little and an open, low seam forms.

Heard on the job

Joint matching's off, you're three inches over the cold side, pull the extension in before the raker has to dig it out.

Insider tip

Veterans check the overlap with a tape on the first pull of the day; anything past an inch and a half turns into extra work for the rakers.

Also heard as

  • matching the joint