OCAP

abbreviationStandard termStatistics

Out-of-control action plan: the scripted checklist that tells operators exactly what to do when an SPC chart fires.

Out-of-control action plan, a flowchart attached to each SPC chart that walks the responder through the checks and actions for a violation: confirm the measurement, remeasure, check the tool log, hold or release the lot, take the tool down, escalate to engineering. A good OCAP lets the night shift resolve most OOCs in minutes without calling anyone. In fabs and automotive plants, an SPC chart without an OCAP is treated as an audit finding.

Heard on the job

Follow the OCAP: remeasure on the backup ellipsometer first, and only call me if it's still above the UCL.

Insider tip

If the first box in an OCAP is not 'verify the measurement', expect a lot of tools taken down for typos and bad gauge reads.

Also heard as

  • out-of-control action plan
  • reaction plan