Makespan

nounStandard termProduction

The total duration required to complete a specific set of scheduled jobs.

This metric calculates the absolute time difference between the start of the first task in a sequence and the completion of the final task. Planners use it to evaluate the efficiency of a schedule across multiple machines or workstations. Minimizing this duration directly increases machine utilization and overall factory throughput.

Heard on the job

We need to optimize the routing on line four because our makespan for this batch is bleeding into the third shift.

Insider tip

A shorter makespan usually means less idle time, but pushing it too low can strip away the buffer needed to handle unexpected machine faults.