A historic term for the waste material, soil, or broken rock packed back into an excavated space or piled up to form a structural embankment. Miners and civil engineers used this fill to stabilize the ground above mined-out stopes or to build up surface infrastructure.
Heard on the job
The old plans show they used remblai to backfill the upper cut before driving the lower level.