ERS

abbreviationStandard termHydrography

Ellipsoidally referenced survey: depths taken from GNSS ellipsoid heights and converted to chart datum with a separation model.

Ellipsoidally referenced surveying uses high-accuracy GNSS heights of the vessel to measure the seabed relative to the ellipsoid, then converts to chart datum through a separation model. Because the vessel's height is measured directly, errors from tides, squat, draft change and long-period heave largely drop out. It depends on RTK or PPK heights and a sound separation model, and it removes the need for zoned tides far from gauges.

Heard on the job

We're running ERS on this job, so no tide gauges, just the separation surface and PPK.

Insider tip

ERS moves the vertical risk from the tide gauges to the separation model, so a bad model gives a perfectly consistent but wrong survey.

Also heard as

  • ellipsoidally referenced survey
  • ellipsoid-referenced survey
  • GNSS tides